The tank and its associated mounting, normally legs, may be designed and constructed for at least a 25 year original life in the intended duty.
The design, supply and installation of ancillary equipment may include, but not be limited to, the following
Tanks can be offered either on an ex works basis, delivered to site, or delivered and installed on site including seismically rated hold down bolts.
Level 2 Quality Handover documentation is supplied on completion.